航天飞机 Discovery / OV-103 | STS-131

Space Shuttle Discovery / OV-103 | STS-131

发射信息

任务代号: 2010-012
发射状态: 发射成功
发射服务商: United Space Alliance
火箭型号: 航天飞机
火箭家族: 未知
任务名称: STS-131
任务类型: 人类探索
发射地点: 肯尼迪航天中心
发射工位: LC-39A
轨道类型: 近地轨道
发射时间:2010-04-05 18:21:22 CST
时区:中国标准时间 (UTC+08:00)
YouTube

任务详情

STS-131 was an ISS assembly flight with the primary payload being a loaded Multi-Purpose Logistics Module - Leonardo. The mission began on April 5th 2010 at 1021:22 UTC launching Commander Alan Poindexter, Pilot James Dutton, Mission Specialist 1 Richard Mastracchio, Mission Specialist 2 Dorothy M. Metcalf-Lindenburger, Mission Specialist 3 Stephanie Wilson, Mission Specialist 4 Naoko Yamazaki & Mission Specialist 5 Clayton Anderson to orbit. They docked with the ISS 2 days after launch. The mission was the final Space Shuttle launch with a seven person crew and was the longest flight for Discovery. STS-131 also marked the first time 4 women have been in space at once. During the mission 3 spacewalks were conducted to replace an ammonia tank and to retrieve a seed experiment from outside the Japanese laboratory. The mission concluded after 15 days & 2 hours on April 20th 2010 at 1308:35 UTC after 2 waved off landing opportunities on the 19th at the Kennedy Space Center.

运营机构

未知

火箭详情

基本信息
名称 航天飞机
全名 航天飞机
家族 未知
型号
制造商 NASA
规格参数
长度 56.1 m
直径 8 m
最小级数 2
最大级数 2
起飞质量 2030 t
起飞推力 28200 kN
LEO运力 27500 kg
GTO运力 - kg
首飞时间 1981-04-12
描述

The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS). Five complete Space Shuttle orbiter vehicles were built and flown on a total of 135 missions from 1981 to 2011.

发射场详情

发射场名称 肯尼迪航天中心
发射工位 LC-39A
国家 美国
经纬度 28.60822681, -80.60428186
发射场

发射统计

5044

全球轨道发射总数

12

本年度全球发射

2

本年度该机构发射

2

本年度该工位发射

视频链接